India’s 1st Dedicated Railway Test Track Is Being Constructed In Rajasthan
A dedicated railway test track is being constructed in Rajasthan to develop the facility for testing rolling stock. This track will be completed by December 2025. The country’s first train trial track in Rajasthan is almost ready. This 60 km long track is not completely straight but many curved points have been made. With this, a trial can be taken of how the train coming at speed will pass on the curved track without reducing the speed. In these curves, some curves are made for lower speed and some are made for high speed. After the completion of the first phase, bullet trains can also be tested at a speed of 230 kmph. The establishment… Read More »India’s 1st Dedicated Railway Test Track Is Being Constructed In Rajasthan